top of page
Modus_Logo.png
CS_Typical High Street - Winter.jpg

City of Fort St. John 100 Street
Greenway Charrette

THE CHALLENGE

As a “once in a lifetime” infrastructure replacement project, the City of Fort St. John is

replacing 14-blocks of 100 Street, including deep utilities, carriageway and public realm. The City sought to engage residents in a public process to refine a design vision and proactively address potential implementation challenges.


THE RESPONSE

MODUS conducted a month’s long process to engage the community in their vision for 100

Street, culminating in a multi-day public design charrette, considering the central theme of a “street for all.” Block-by-block, parcel-by-parcel, design exploration considered the unique constraints and opportunities along the corridor related to adjacent conditions (building frontages and open spaces) and how street design could enhance pedestrian safety, comfort and enjoyment along Fort St. John’s “main street.”

CLIENT

City of Fort St. John

COLLABORATORS

MODUS

Urban Systems

Cal Srigley

Frank Ducote

Kim Perry

​​Our office is located on the unceded and occupied lands of the xʷməθkʷəy̓əm (Musqueam), Skwxwú7mesh (Squamish) and səl̓ilwətaɁɬ (Tsleil-Waututh) Nations. Click here to find out more about our commitments to the long-term work of Truth and Reconciliation. 

CONTACT

#207 - 55 East Cordova Street

Vancouver, BC

V6A 0A5

hello@thinkmodus.ca

Tel: (604) 736-7755

CONNECT

  • Instagram
  • LinkedIn

NEWSLETTER

2018-B-Corp-Logo-White-L.png
bottom of page